Protecta Edge Foam Edge Protector
Case Study: Frontline Protection for Australian Defence Manufacturer
Posted on 18/06/2025
Operating across a large, high-traffic construction site, Kapitol Group team required protection solutions to improve mobility and site safety.
Case Study: Preserving Australian Heritage One Step at a Time
Posted on 02/04/2024
A new skylight needed to be installed directly above the iconic marble staircase. The foyer and staircase are a popular thoroughfare for staff and visitors to Parliament House. Therefore, the installation needed to be completed in a short time frame to minimise disruption.

Case Study: Mass Vaccination Centre With Over 70 Cubicles Set Up In Two Days
Posted on 23/08/2021
Responsive customer service and having available stock and expertise on hand meant that HD Constructions were able to deliver the project on time. As a result, all NSW HSC students were able to be vaccinated in preparation for their trial examinations.
Show per page